On 30 November 2022, Ofgem published its final determinations for RIIO-ED2, the second electricity distribution price control under the RIIO framework, covering the five years from 1 April 2023 to 31 March 2028. The settlement set upfront total expenditure allowances of £22.2 billion across the fourteen distribution network operators, 12% below what the companies asked for, while cutting the allowed cost of equity to 5.23% in CPIH-real terms, against 6.0% at RIIO-ED1 in Retail Prices Index terms, about 6.7% on a comparable CPIH basis. The control returned to a five-year length, shifted inflation indexation from the Retail Prices Index to CPIH, indexed both debt and equity allowances to market rates, and leaned heavily on thirty-seven common uncertainty mechanisms so that funding for the net zero transition could flex within the period rather than being fixed at the start.

Key takeaways

‍

  • RIIO-ED2 is the current electricity distribution price control in Great Britain. Final determinations were published on 30 November 2022 and the control runs from 1 April 2023 to 31 March 2028, back to five years after the eight-year RIIO-ED1.
  • Ofgem set upfront total expenditure allowances of £22.2 billion in 2020/21 prices, 12% below the £25.2 billion the companies submitted but £1.3 billion above the June 2022 draft. Annual average spending was allowed to rise 17% against RIIO-ED1 levels.
  • The package included £3.2 billion for network upgrades to support electric vehicles, heat pumps and local low carbon generation, a figure that already includes the £0.4 billion added for the Access and Forward-Looking Charges decision, and an initial £5.7 billion for maintaining, repairing and replacing key assets.
  • The allowed cost of equity fell to 5.23% CPIH-real at 60% notional gearing, against 6.0% at RIIO-ED1 in Retail Prices Index terms, about 6.7% restated on the 0.7 percentage point inflation wedge Ofgem used at these determinations, and both equity and debt allowances are indexed to market rates during the period.
  • The vanilla weighted average cost of capital was forecast at 3.90% for the three licensees classed as frequent issuers of debt and 3.93% for the rest. Between the June draft and the November final determinations, rising gilt yields pushed the cost of equity up from 4.75% and the cost of debt from around 2.3% to around 3.0%.
  • Notional gearing was cut from 65% to 60%, partly reversing the increases of 2004 and 2009, and inflation indexation of the asset base moved from the Retail Prices Index to CPIH.
  • There was no fast-tracking. A business plan incentive rewarded or penalised the quality and ambition of plans, and every company was assessed on the same timetable.
  • Incentive power was deliberately reduced: totex sharing factors of 49.3% to 50.0%, against 53% to 58% for the companies settled late at RIIO-ED1 and 70% for fast-tracked Western Power Distribution, and a new return adjustment mechanism claws back half of returns more than 300 basis points from the baseline allowed return and 90% beyond 400 basis points, in both directions.
  • Thirty-seven common uncertainty mechanisms, plus seven bespoke ones, allow allowances to flex with the pace of the transition, a direct response to uncertainty about electric vehicle and heat pump uptake.
  • Northern Powergrid appealed to the Competition and Markets Authority, which in September 2023 partially upheld the appeal on the allocation of allowances between cost categories and dismissed the ground on the business plan incentive.

Scope of this article

‍

This article covers RIIO-ED2, the price control that took effect for Great Britain's fourteen electricity distribution network operators on 1 April 2023. It is the seventh article in this series and follows the sixth, on RIIO-ED1. It draws primarily on Ofgem's final determinations overview, the finance annex and the core methodology document of 30 November 2022, together with the company annexes, the June 2022 draft determinations and the Competition and Markets Authority's September 2023 appeal decision. Figures are in 2020/21 prices unless stated otherwise.

‍

‍

Table 1: How the review unfolded, August 2019 to February 2024

‍

DateStep
August 2019 Ofgem opens the process with a letter setting out the context and aims for RIIO-ED2.
December 2019 Framework decision confirms a five-year control under the RIIO-2 model.
July 2020 Sector specific methodology consultation.
December 2020 Sector specific methodology decision, fixing outputs, cost assessment and finance methodology.
1 December 2021 The fourteen distribution network operators submit final business plans.
January to March 2022 Customer engagement group reports; the RIIO-ED2 challenge group reports on all fourteen plans on 8 February; public open hearings on the plans in March.
29 June 2022 Draft determinations published for consultation, closing 25 August 2022.
30 November 2022 Final determinations published.
3 February 2023 Ofgem decides the licence modifications implementing the settlement.
1 April 2023 RIIO-ED2 takes effect.
March 2023 Northern Powergrid appeals the licence modifications to the Competition and Markets Authority.
21 September 2023 The Competition and Markets Authority partially upholds the appeal and remits one issue to Ofgem.
13 February 2024 Ofgem decides revised licence conditions implementing the redetermination.

Sources: Ofgem, RIIO-ED2 Final Determinations Overview document, November 2022; Ofgem decision on the RIIO-2 electricity distribution licence modifications, February 2023; Competition and Markets Authority, final determination of the Northern Powergrid appeal, September 2023; Ofgem licence modification notice, February 2024.

‍

Why did the control return to five years?

‍

RIIO-ED2 was shaped by what its predecessor had come to stand for. As the previous article in this series set out, RIIO-ED1 delivered operationally but left companies on course for returns of around 9% in real terms against a United Kingdom company average of 5% to 6%, and the National Audit Office criticised the eight-year length for locking in a generous settlement. Ofgem had already answered for the transmission and gas distribution sectors in the RIIO-2 controls that began in 2021: five-year periods, materially lower equity returns, weaker totex incentives and a backstop on aggregate returns. RIIO-ED2 extended that answer to electricity distribution.

The process itself changed too. Fast-tracking was dropped. At RIIO-ED1, it had handed Western Power Distribution an early settlement, an allowed cost of equity of 6.4% against 6.0% for the ten companies settled late, an efficiency incentive rate of 70% against 53% to 58%, and a financial benefit Ofgem put at around £250 million. In its place came a business plan incentive that rewarded well justified, ambitious plans and penalised poorly evidenced costs, applied to all companies on a single timetable. An enhanced engagement structure surrounded the plans: each company faced an independent customer engagement group, a central RIIO-ED2 challenge group reported on all fourteen plans on 8 February 2022, and public open hearings in March 2022 let stakeholders question the companies directly, a first for a British network price control.

Ownership changed mid-review. Western Power Distribution, the fast-track star of RIIO-ED1, had been acquired by National Grid and was renamed National Grid Electricity Distribution on 21 September 2022, so the four Midlands, South West and South Wales licensees appear under that name in the final determinations. The energy crisis that followed the Russian invasion of Ukraine formed the backdrop to the decision: Ofgem framed the settlement as accelerating the move away from imported gas at no extra cost to consumers, with the average consumer paying about £91 a year for electricity distribution within their bills.

‍

‍

How much did the settlement allow and how were costs assessed?

‍

The companies submitted plans totalling £25.2 billion of net total expenditure. Ofgem's June 2022 draft determinations allowed £20.9 billion, an average cut of about 17%. The final determinations settled at £22.2 billion, 12% below the submitted plans: additional evidence in consultation responses, revisions to the benchmarking models and a softening of the ongoing efficiency target from 1.2% to 1.0% a year restored £1.3 billion between draft and final. That £22.2 billion is measured before non-price control allocations and post-modelling adjustments. After those, and including the £0.4 billion allowed for the Access and Forward-Looking Charges decision, ex ante allowances settled at £21.4 billion, which Ofgem presented as a 17% increase in annual average spending against RIIO-ED1 outturn and forecast levels.

‍

‍

Figure 1: Submitted, draft and final total expenditure by licensee, £m in 2020/21 prices

‍

‍

The dispersion across companies shows how the assessment worked. The largest percentage cuts fell on National Grid Electricity Distribution's South West licensee, at 17.6% below its plan, and on Scottish and Southern Electricity Networks' southern licensee at 15.5%, while UK Power Networks' three licensees, judged among the most efficient, lost only 5% to 8%. Benchmarking used total expenditure models alongside a disaggregated activity-level model, with the efficiency frontier set at the 75th percentile in the first year, tightening along a glide path to the 85th percentile for the final two years of the control. Alongside that catch-up challenge, Ofgem applied an ongoing efficiency assumption of 1.0% a year, down from 1.2% at draft determinations, which it expects even frontier companies to deliver.

‍

‍

Table 2: Submitted and allowed total expenditure by licensee (£m, 2020/21 prices)

‍

Group Licensee Submitted Draft Final Final vs
submitted
ENWL ENWL 1,890 1,640 1,722 -8.9%
Northern Powergrid Northeast 1,393 1,129 1,186 -14.9%
Yorkshire 1,838 1,521 1,596 -13.2%
NGED West Midlands 1,934 1,588 1,679 -13.2%
East Midlands 2,058 1,697 1,838 -10.7%
South Wales 1,143 953 1,015 -11.1%
South West 1,758 1,343 1,449 -17.6%
UK Power Networks London 1,499 1,323 1,416 -5.6%
South Eastern 1,554 1,394 1,476 -5.0%
Eastern 2,470 2,137 2,277 -7.8%
SP Energy Networks SP Distribution 1,676 1,451 1,469 -12.4%
SP Manweb 1,721 1,477 1,476 -14.3%
SSEN Hydro 1,406 1,087 1,227 -12.7%
Southern 2,835 2,199 2,397 -15.5%
Total 25,175 20,939 22,224 -11.7%

Source: Ofgem, RIIO-ED2 Final Determinations Overview document, November 2022, Table 3.

‍

Net totex before non-price control allocations and post-modelling adjustments, excluding real price effects, non-controllable and pass-through costs. Percentages are as Ofgem prints them.

‍

How did Ofgem set the cost of capital?

‍

RIIO-ED2 was the first distribution control set in CPIH-real terms, ending three decades of Retail Prices Index linkage in the sector, and the methodology followed the RIIO-2 transmission and gas distribution controls as tested in the 2021 appeals to the Competition and Markets Authority. Ofgem set the allowed return on equity at 5.23% at 60% notional gearing, built from a risk-free rate of 1.23%, a total market return of 6.50% and a notional equity beta of 0.759. One legacy of the appeals shaped the number: the 25 basis point deduction for expected outperformance that Ofgem had applied in the earlier RIIO-2 controls, and which the appeal panel quashed, was dropped.

The equity decision moved a long way within the review. The June 2022 draft proposed 4.75%; by November the yields on index-linked gilts had risen sharply, lifting the risk-free rate from minus 0.74% to plus 1.23% and the final allowance to 5.23%. The debt allowance moved the same way, from around 2.3% to 3.01% for the three licensees classed as frequent issuers and 3.07% for the rest, based on a 17-year trailing average of the iBoxx GBP Utilities 10yr+ index with a 55 basis point calibration adjustment and 25 basis points for additional borrowing costs, deflated to CPIH-real terms. The 6 basis point gap between the two figures is an infrequent issuer premium, paid to every licensee expected to issue less than £250 million of new debt a year. Both allowances are indexed, so they move with markets during the period rather than being fixed for five years, completing a journey that began with the debt index at RIIO-ED1.

‍

‍

Figure 2: The RIIO-ED2 cost of capital at draft and final determinations, CPIH real

‍

‍

‍

Table 3: The RIIO-ED2 baseline allowed return on capital (five-year average, CPIH real)

‍

ComponentFinal determinationDraft determination
Notional gearing 60% 60%
Cost of equity (post-tax real) 5.23% 4.75%
Cost of debt (pre-tax real) 3.01% frequent issuers; 3.07% others 2.26% / 2.32%
Vanilla weighted average cost of capital 3.90% / 3.93% 3.26% / 3.29%

Source: Ofgem, RIIO-ED2 Final Determinations Finance Annex, November 2022, Tables 4, 10 and 14; RIIO-ED2 Draft Determinations Finance Annex, June 2022, Tables 4, 5 and 12.

‍

Frequent issuers of debt at final determinations are the East Midlands, Eastern and SSEN Southern licensees. At draft determinations the infrequent issuer premium applied instead to the London, Northern Powergrid Northeast and South Wales licensees, so the two columns do not describe the same three companies.

Ofgem publishes the vanilla weighted average cost of capital only for the final determinations; the draft figures here are calculated from Ofgem's own draft inputs on its own formula, gearing multiplied by the cost of debt plus one minus gearing multiplied by the cost of equity.

‍

On a like-for-like basis the equity allowance fell hard. Ofgem's RIIO-ED1 allowance of 6.0% was set in Retail Prices Index terms. Restated on the 0.7 percentage point RPI to CPIH inflation wedge Ofgem used at these determinations, it is about 6.7% in CPIH terms, so 5.23% is a cut of about one and a half percentage points on a comparable basis. The largest step at any earlier review in this series was the 0.8 percentage point fall from 7.5% at DPCR4 to 6.7% at DPCR5. Notional gearing came down from 65% to 60%, partly reversing the increases of 2004 and 2009, and the 45-year asset life for new additions, introduced at RIIO-ED1, was retained. Ofgem judged each notional company financeable, with one, two or three notches of headroom above minimum investment grade.

‍

How did the control handle uncertainty?

‍

The hardest design problem at RIIO-ED2 was that nobody knew how quickly electrification would come. Fixing five years of load-related investment upfront risked either paying for reinforcement that demand never called for, or starving networks that faced a surge of electric vehicles and heat pumps. Ofgem's answer was to fund only work that was certain in need and cost, and to route the rest through thirty-seven common uncertainty mechanisms plus seven bespoke ones: volume drivers that scale allowances automatically with delivered work, sixteen re-opener windows for costs that become clear in period, pass-throughs, indexation and use-it-or-lose-it allowances.

Most of that machinery deals with load-related investment. Volume drivers cover low voltage service connections and secondary reinforcement, a load-related re-opener handles larger schemes, and an indirect scaler adds 10.8% to each unit of load-related allowance to fund the associated overheads. The materiality threshold for re-opener applications was halved from the draft position, to 0.5% of annual average base revenue, after the companies argued that a five-year control with lower upfront allowances needed easier access to in-period adjustment. Re-openers for Storm Arwen recommendations, wayleaves and diversions, high value projects above £25 million, net zero policy change, cyber resilience and digitalisation completed the set. Against the fixed five-year settlements of the RPI-X era covered earlier in this series, RIIO-ED2 is better described as a framework for continuous determination than as a single determination.

‍

What outputs and incentives applied?

‍

The outputs framework carried over the RIIO structure of licence obligations, price control deliverables and output delivery incentives, with seven common financial incentives. The interruptions incentive remained the most powerful, worth up to plus 1.5% or minus 2.5% of the return on regulatory equity, alongside customer satisfaction at plus or minus 0.4%, and new incentives for distribution system operation, consumer vulnerability and major connections. The combined common package spans plus 2.65% to minus 4% of the return on regulatory equity. A new set of obligations and incentives for the distribution system operator role, with executive accountability for neutral decisions between running the network and operating the system, marked the arrival of flexibility markets in the licence itself.

Two mechanisms pulled the other way. Totex sharing factors were set between 49.3% and 50.0%, down from 53% to 58% for the ten companies settled late at RIIO-ED1 and 70% for fast-tracked Western Power Distribution, so companies keep less of any underspend and bear less of any overspend. And a return adjustment mechanism, new to distribution, claws back 50% of returns more than 300 basis points above or below the baseline allowed return and 90% beyond 400 basis points, in both directions. Set alongside the business plan incentive and the uncertainty machinery, these show what the design was for. After two decades in which companies systematically beat their settlements, the scope for outperformance was engineered down.

‍

What happened after the final determinations?

‍

Ofgem decided the implementing licence modifications on 3 February 2023 and the control began on 1 April 2023. One group appealed. Northern Powergrid's two licensees challenged the settlement at the Competition and Markets Authority in March 2023 on two grounds: that Ofgem had misallocated allowances between cost categories, leaving the load-related element underfunded, and that its Yorkshire licensee had been wrongly denied a business plan incentive reward. On 21 September 2023 the authority upheld the first ground and dismissed the second, remitting the allocation question to Ofgem for redetermination, which Ofgem implemented through revised licence conditions in February 2024.

That one group appealed, and on one narrow issue, is worth noting. The RIIO-2 transmission and gas distribution determinations of 2020 had drawn eight appeals covering nine companies, including a direct challenge to the cost of equity that the authority rejected outright. By the time RIIO-ED2 was decided, the equity methodology had survived that test, and no distribution company chose to relitigate it. The contested ground had moved from how much investors should earn to how allowances should flex with an uncertain energy transition, which is where the preparations for RIIO-ED3 now sit: Ofgem confirmed the framework for the next control in April 2025 and its sector specific methodology in May 2026, ahead of a start on 1 April 2028.

‍

What does RIIO-ED2 mean for the story of distribution regulation?

‍

Against the thirty years this series covers, RIIO-ED2 does two things. The first is a correction, and it addresses the oldest pattern in these articles, from the 1995 reopening through the National Audit Office's findings on RIIO-ED1: controls calibrated cautiously on risk and cost, outperformed by companies safer and cheaper to run than assumed. RIIO-ED2's response was structural. An equity allowance about one and a half percentage points lower on a comparable basis, weaker sharing factors, a clawback on aggregate returns, and a five-year horizon restored.

The second is a change in what a price control is for. The reviews of 1990 to 2009 asked how little an existing network could cost; RIIO-ED2 asks how a network should be rebuilt for electrified heat and transport without paying for capacity before it is needed. Much of the design effort went into mechanisms for changing the answer mid-period. Whether that adaptive model can fund the largest re-engineering of the distribution networks since their construction, while holding returns to utility levels, is the question RIIO-ED3 inherits. That is where this series picks up next.

‍

References

‍

  1. Competition and Markets Authority. (2023a). Energy licence modification appeal 2023: Northern Powergrid (Northeast) plc and Northern Powergrid (Yorkshire) plc v the Gas and Electricity Markets Authority – Final determination. Competition and Markets Authority.
  2. Competition and Markets Authority. (2023b). Energy licence modification appeal 2023: Case page. Competition and Markets Authority.
  3. National Audit Office. (2020). Electricity networks (HC 42, Session 2019-20). National Audit Office.
  4. Ofgem. (2014). RIIO-ED1: Final determinations for the slow-track electricity distribution companies – Overview. Office of Gas and Electricity Markets.
  5. Ofgem. (2022a). RIIO-ED2 draft determinations – Overview document. Office of Gas and Electricity Markets.
  6. Ofgem. (2022b). RIIO-ED2 draft determinations – Finance annex. Office of Gas and Electricity Markets.
  7. Ofgem. (2022c). RIIO-ED2 final determinations – Overview document. Office of Gas and Electricity Markets.
  8. Ofgem. (2022d). RIIO-ED2 final determinations – Core methodology document. Office of Gas and Electricity Markets.
  9. Ofgem. (2022e). RIIO-ED2 final determinations – Finance annex. Office of Gas and Electricity Markets.
  10. Ofgem. (2022f). RIIO-ED2 final determinations – Company annexes [ENWL, NGED, NPg, SPEN, SSEN and UKPN annexes]. Office of Gas and Electricity Markets.
  11. Ofgem. (2023). Decision on the proposed modifications to the RIIO-2 electricity distribution licences. Office of Gas and Electricity Markets.
  12. Ofgem. (2024a). Decision on the proposed modifications to the RIIO-ED2 electricity distribution standard and special licence conditions. Office of Gas and Electricity Markets.
  13. Ofgem. (2024b). RIIO-ED2 statutory licence modification notice: Special conditions (CMA). Office of Gas and Electricity Markets.
  14. Ofgem. (2025). Framework decision: Electricity distribution price control (ED3). Office of Gas and Electricity Markets.
  15. Ofgem. (2026). ED3 sector specific methodology decision: Core document. Office of Gas and Electricity Markets.

‍

Authors

‍

 What’s next

Featured

This paper has been published on following other platforms

No items found.

I was delighted that MCC's work was completed on time, and within budget, helping us deliver important changes and improvements, to the benefit of our stakeholders. ​ MCC's report is published on the CCC website.

- Bea Natzler
Team Leader at Climate Change Committee, UK

I am delighted to recommend MCC Economics. Specifically, I worked closely with PJ, who helped us with our Nuclear and CCUS projects. PJ helped us develop new policies and answer questions from our stakeholders. ​​His support helped us deliver important changes and improvements, to the benefit of our stakeholders.

- Gordon Hutcheson
Head of Nuclear Policy at Ofgem, UK

MCC Economics has helped us better understand the most important issues for our stakeholders, including: charges, shareholder returns, debt payments and inflation impacts.

- Leila N. Nasr
Section Head at Department of Energy, Abu Dhabi

I am delighted to recommend PJ and his team at MCC Economics. We've been working together on National Policy Statements to help meet net zero targets for 2030 and 2050. We initially appointed MCC Economics to support us on offshore wind consultation analysis and have recently reappointed MCC Economics to undertake a larger consultation analysis role across all sectors, including hydrogen, CCUS and networks. I can confirm that PJ and his team have shown excellent spreadsheet skills, alongside very good project management, planning and analysis skills, helping us deliver important changes, and continuous improvements, to the benefit of our stakeholders.

- Amy McHugh
Head of Environment in the Energy Infrastructure Planning Policy, UK

I am delighted to recommend PJ and his team from MCC Economics. They helped us with our price controls for Heathrow airport and for NATS (En Route) plc (the air traffic services provider). Specifically, the MCC team helped us deliver important changes and improvements to our financial models and supporting policy documents, to the benefit of our stakeholders.

- Dan Rock
Head of Corporate Finance at CAA, UK

I am delighted to confirm that I worked with PJ on a retail project in 2015. The project helped stakeholders understand electricity costs and charges. Specifically, the project helped us explain to stakeholders, internally and externally, why electricity charges differed across the regions (GB, NI & Ireland). PJ was a key member on the project team, which helped deliver changes and improvements in the understanding of energy retail.

- Kevin Shiels
Director at Utility Regulator, Northern Ireland